On 27 May 2023, Army got information that few miscreants have tried to damage the Wainem Bridge and dislocated three panels. Immediately the nearest Army column responded to the call and reached the incidents site with a recovery vehicle. The bridge was partially damaged and required urgent repair to facilitate unhindered move of vehicles. The column with the help of villagers of Wainem, Imol & Irengbam could repair the bridge in minimum possible time and bridge is ready for move of men and material.
Timely effort by the Army column was appreciated by the local populace and they expressed their gratitude to the security forces for their undaunting support.